PACHORA-JAMNER (NG)  SECTION. :  A CASE STUDY

 

                 As  per the    instructions  of  FA&CAO/C.Rly., Sr. DFM’s are  require to submit quarterly  case  study/test check reports to H.Q.  In this conection we feel some of the reports  prepared by BSL Division  can be put in the web  for wider circulation. This is first such report.

 

    We have a number of  Branch Lines which are  financial  burden on Railways.  The  problems of all such lines  are similar.  Here an effort has been made through this case study to assess the cost benefit of the Pachora-Jamner branch line of the BSL division   and also examine the possibility  of off-loading the commercial function/other functions to trade in order to make the line  economically viable.

 

General Information: This is a branch line of IGP-BSL main line under BSL division.  The other details are as followed:

 

 

1

Approximate Total length of the track                      

54 Kms.

2

Age of structures

Since pre-independence.

3

Stations  in route.

 6 Nos.

4

Road  Crossing  gates 

9  Manned Gates. 

5

Type of track                                                      

Rails on Wooden sleepers                                                                                                           directly laid  on earth work     beneath

6

Nos. &  Type of  Locomotive.

Cummins Diesel Driven  [ 1+1], with speed limit of 45 Kms/Hr.                                                     

7

Nos.  & Type of Bogies [Passenger]

4 Nos.  One Guard cum parcel van.

8

Nos. & Type of Bogies [Goods]

Nil

9

Land Plans and uses

Track/station Bldg. Quarters, turn table & locoshed at Pachora, one loop line at Jamner

10

Frequency of Trains as on date

Daily four trips  of passenger train between Pachora and Jamner

11

Name  & approx. population  of neighbouring villages

Pachora, (80,000) Varkhedi (10,000),Pimpalgaon (5000), Shedurni (10,000), Pahur (10,000),Bagdara (5000),Jamner (45,000).

12

Present Status

As on date, the whole set up except ticketing for intermediate  stations, is being run by BSL division staff.  For Ticket collection, a contract is given for intermediate stations on 15% commission basis.  This is further subject to minimum of Rs. 500/- and maximum of  Rs. 3000/- per month on gross earnings for each station.

13

Revenue means

Passenger fares and Parcel

14

Train Fair/Concession.

Maximum Fair is Rs. 13/- only for Jamner-Pachora with  100% concession to students as per rule.

.                                           

STATEMENT OF EARNING & EXPENDITURE OF PACHORA – JAMNER SECTION (NG) FOR THE YEAR 2001-02.

 

REVENUE     :                                            

 

Passengers.   :

 

             No. of  pass.                =          368398         

             Earnings.                     =       Rs.22.99 lacs.

Parcel :

 

             No. of  Pkgs.            =     817             

             Earnings.                 =     Rs.00.38 lacs.         

                                              -----------------------                

             Total earnings             =       Rs.  23.37 lac.

                                                                                                 

                                                                       

Expenditure:(Rs. In Lac)

 

              Direct Cost  - Staff Salary.

 

              Civil                       =    Rs.04.32

              Electrical                 =      Rs.01.82

              Mechanical              =      Rs.11.33

              S&T                       =      Rs. 

              Traffic                    =      Rs.10.51

                                              ----------------

              Total                      =    Rs.27.98

 

              Indirect Cost  -

 

               Fuel                      =    Rs.20.05

               Rolling Stock           =       Rs.00.63

               Building/                 =    Rs.00.81

               Quarters

                S&T                     =    Rs.01.16

                Electrical               =    Rs.00.54

                                            ------------------

                Total                    =    Rs.23.19

                Grand Total           =    Rs.51.17 lac.

                Total Loss.            =       Rs.27.80 lac  (Rs.23.37 – 51.17)

 

NOTE :   1)  At Pachora – tickets are sold by Booking Clerk both for BG & NG.

2)  At Jamner – One Booking Clerk is posted for sale of tickets.

3)     The intermediate stations for which contractors are appointed  for sale of tickets are : Varkhedi, Pimpalgaon, Shendurni, Pahur & Bhagara.

 

 

SALE OF TICKETS AND EARNINGS ON  A PEAK  DAY – 01/08/2002.

 

                   A team of  inspectors  was deputed to assess the actual earnings and number of  passengers on a peak traffic day, i.e. Mela Day.  This  was basically meant  to see whether  there is ticket-less travel or any other  leakage.  The number  of passenger  was  arrived by  head count  and revenue was  assessed by counting the cash collected  at  each  station.  The figure as obtained pertaining to four trips in a day  are  given below :  

 

Station

               621

          623

 

No. of  passengers.

.

Amount in Rs. 

 

No. of Passengers.

Amount in Rs

PC

         77

520

      79

884

VRKD

         49

424   

      74

506

PNGN

         19

122

        8

51

SDRN

         35

195

       15

120

PHU

         34

77

         2

14

BGR

        357

895      

       13

65

TOTAL

        571

2233

      191

1640

 

Station

                   622

                         624

Coach

No.of Passengers. Amount in Rs.

 

No. of Passengers Amount in Rs.

 

JMNR

        75

797

         451

1685

BGR

          9

60  

             6

57

PHU

        18

168 

           37

330

SDRN

        25

166

           53

252

PNGN

        40

212  

           20

88

VRKD

          1

6

             2

6

Total

       168

1409

          569

2418

 

          Thus, the total  number of passengers  boarding  the train on 01/08/2002  and the amount  earned  was  1499 and Rs 7,700/-  respectively and  this included the students.   It was further revealed that the traffic was  less  on other days.  There were five bogies  in operation on PC-JMNR Section and  7 ticket- less  passengers  found  in each  trip, i.e. total 28 ticket-less passengers per day  and most of them  were  beggars.

 

From the above, it can be  fairly concluded  that the findings of the committee are very  close  to the earning figures available with us. 

 

            As per the data available, we are  spending  more than double  the  cost   of what we are   earning. The   earning of  a  peak transport day is  also less than average  expenditure  for  one day

                                        

 

 

 

 STEPS TAKEN  TOWARDS VIABILITY.    

 

 

         As per the policy direction, the following steps  have been taken to explore the possibilities of making the line economically viable.  

 

1. Concessioning of lines  to private operators :                     

             

            A proposal for exploring the  possibility of  off-loading   the commercial activities including Catering,Canteen,Advertisement and Parcel was put forward by this division to transporters   for preliminary  assessment of  revenue  potential.  However, reaction  was  not encouraging.     In the opinion of  transporters, as communicated  vide their letter dated 04/08/2002,  this is a  loss making  section due to scanty  habitation in the  area  and also being a  non-irrigated agricultural  zone.  According to  them there is a limited  demand  for  transportation and  other   associated   business  in the  vicinity  of  this  section.

 

           

 2.             Introduction of Rail Bus by replacing the loco hauled trains – Effort was made to introduce the Rail Bus in some other uneconomic branch line  i.e. MZR – Achalpur section.  However, considering the number of passengers now being carried in the train, trial has been found to be unsuccessful by DRM/BSL.

 

3.                Increasing the frequency of services – Due to less speed of the train and the length of the section.It is not found possible to introduce any additional services in the section considering the operational constraints such as lack of crossing facilities, speed of the train etc. Also, there is no demand for any additional service.

 

4.               Adjustment of the train timings – Some train timings now have to be adjusted due to introduction of travelling gateman. The proposals have been formulated   by the division.

 

5.                 Sale of tickets in the Bus itself, dispense with station booking staff – There is no separate  booking staff  anywhere on the NG system for ticket sales..  The ticket sale is done by the Guard   Contractor  ASMs or Contractors.

 

6.                 Introduction of travelling Gateman – Removal of stationary gateman

This has been found feasible in Pachora – Jamner section except for one gate which is close to the bridge.Accordingly it will be possible to surrender 8 gatemen out of 9. However, it will require change in train timings. A proposal is being developed by the division for the same.

 

7.        Review of maintenance staff - 

This has been done and no further reduction is feasible.

 

 

Thus the  future possibilities for the Brach line  are limited.  Maintenance of  the  N.G. route is  going to be more difficult  in future.  Therefore,  either the line needs to be converted into broad gauge   and made part of  larger  linkages    or this may be dismantled    altogether, though the latter  is politically not viable.     

 

 

             Thus, it is felt  that  in the prevailing circumstances there is  hardly  any option left   but  to continue  with the existing  system till some major decision is taken

 

 

 

Hira Ballabh, SrDFM/BSL/CR